Starlight Pines is the largest association in the corridor at 638 parcels, and the only one of the six with a current, dated levy: $350 per member for the fiscal year 1 June 2026 to 31 May 2027.
Every figure on this page is from a document, and each one carries the year it applies to. Where a document did not answer a question, the page says so rather than filling the gap.
| Parcels in the plats | 638 |
|---|---|
| Plats recorded | Ten plats |
| Minimum house | 750 sq ft ground floor |
| Gated | Not stated in any document we read |
| Annual assessment | $350 per member, fiscal year 2026–27 |
| Water | Blue Ridge district, 638 of 638 in the service area |
| Wastewater | Individual septic |
| Roads | Homeowners maintain the roads if the county does not accept them |
| Distance to SR-87 | 0.35 miles, south-east of SR-87 |
What it covers
Starlight Pines is the largest single association in the Happy Jack corridor, and one of the few here that publishes its financials. Its plats are all named, and the county's parcel layer puts 638 parcels in them.
| Plat | Recorder doc | Parcels |
|---|---|---|
| Starlight Pines Unit 1 | 1029662 | 55 |
| Starlight Pines Unit Two Corrected Map | 3066213 | 38 |
| Starlight Pines Unit Two Phase One | 1060028 | 88 |
| Starlight Pines Unit Two Phase Two | 1084646 | 84 |
| Starlight Pines Unit 3 | 1114596 | 115 |
| Starlight Pines Unit Four Phase One | 1160639 | 52 |
| Starlight Pines Unit Four Phase Two | 1060028 | 68 |
| Starlight Pines Unit Four Phase Three | 1114596 | 63 |
| Starlight Pines Unit Four Phase Four | 1200811 | 59 |
| Starlight Pines Unit Five Phase One | 1376738 | 16 |
| Total | 638 |
This is the largest single association in the corridor, and one of the few here that publishes its financials. Do not confuse it with Starlight Pines Ranchettes, a separate association with 87 parcels and its own covenants. They share a name, a turn off SR-87 and a water district; they are not the same HOA and their fees are nowhere near each other. A query of Name LIKE 'STARLIGHT PINES%' returns both and yields 725 parcels — 638 for this association and 87 for the Ranchettes.
What the covenants control
- Minimum house size. A ground floor of not less than 750 sq ft. That is the lowest minimum of the six associations here, and the place where a small cabin is most likely to be permitted.
- Architectural control. Separate Architectural Guidelines and Color Guidelines, both from 2024, govern design and color, with a $50 plan review fee per review in that 2024 schedule.
- Trailers and motor vehicles. A 2024 Trailer and Motor Vehicle Statement governs where trailers and RVs may sit — a live issue in a second-home community.
- Horse keeping. A 2023 Corrals and Horse Keeping document sets the conditions.
- Firewise. Firewise Property Rules and annual Firewise inspections apply; the association held a 2025 National Firewise certificate.
- Amending the covenants is deliberately hard. The June 2026 annual meeting recorded that an amendment requires approval from 75% of all lots, which the board called “very difficult”, and it is pursuing a ballot to lower that threshold first. What you read today is likely to be what you live with.
Fees: the one current, dated figure in the corridor
Starlight Pines is the only one of the six with a current, dated, published levy. This is the figure to use.
FY 2026–2027 Regular Annual Assessment: $350 per member. Approved by the board on 14 March 2026, for the fiscal year 1 June 2026 to 31 May 2027. The budget line reads “612 Regular Annual Assessments 2026 – 2027 … $214,200.00”, and $214,200 divided by 612 is $350, so the arithmetic reconciles.
That is 612 assessments billed against 638 parcels: roughly 26 lots are not currently assessed as members. What the $350 buys, from the same 2026–27 budget: refuse collection $52,500; compactor and trash-area maintenance $12,000; directors and officers plus property and liability insurance $22,000; management, wages and payroll taxes $45,000 (the association is self-managed by volunteers but pays staff); legal and collection $10,500; common properties maintenance $10,000; Firewise education and abatements $2,000.
Construction costs and fines, from the schedule approved on 8 February 2025 and effective 1 April 2025: a construction deposit of $500, a cleaning deposit of $500 and a $50 plan review fee. Miss the deadline and the initial penalty rises to $175, then $250 a month; before April 2025 those were $100 and $50.
The covenant still says something different. Section 6.1 provides an ad valorem charge of up to $2.50 per $100 of assessed valuation, with section 6.3 indexing it to CPI — read on 6 November 2026. Two neighbors on the same street could therefore be charged different amounts. The board currently levies a flat $350 per member instead. Both are true: the covenant is the ceiling and the 2026–27 budget is the bill.
Water, roads and the two clauses that matter
Water: the Blue Ridge district. All 638 parcels sit inside the district's service area and 629 of 638 (99%) inside its assessment boundary — the most thoroughly inside-district community of the six.
Start with the exact property address or parcel number. For district service, visit the Blue Ridge Domestic Water Improvement District's official website for its current water rate schedule and contact information. Ask the provider to confirm service, meter or connection status, all current charges and any proposed connection costs for that property. An area name or district boundary does not confirm an active connection. For a private or shared well, use Arizona Department of Water Resources well records and have a qualified well professional explain the records and any current testing needed. For hauled water or an association system, confirm availability and charges directly with that provider.
Subdivision and district maps are starting points, not a service commitment. Ask the water provider to confirm the actual connection, service eligibility and any assessments for the exact parcel before budgeting or buying.
The covenant has a fallback you should know about. Amendment section 3.26 obliges the association to run the water company as a co-op if the utility fails. That clause was written when the private Starlight Water Company served the area; the district bought its assets. The clause is dormant now, but it tells you the community has planned for losing its water provider before.
Wastewater: individual septic, not a community system.
Roads: a conditional duty, and it is the most expensive sentence in this association's documents. Amendment section 3.27 provides that if Coconino County does not accept the dedicated roads, the homeowners maintain the road system. For a buyer that means asking the county, in writing, whether these roads have been accepted. If they have not, the paving and the plowing are a private obligation shared among owners.
Reserves were reported at approximately $185,000 in the minutes of 8 November 2025, and the June 2026 annual meeting was told the association holds sufficient funds and reserves to help avoid special assessments for major items such as roof or compactor replacement.
What owners say online
We could not verify owner commentary, and we will not invent it. On 8 November 2026 we tried the public places where commentary about a subdivision usually appears. The Facebook groups are login-walled and returned nothing readable; Reddit blocked our requests; Nextdoor has no Happy Jack city page at all. Commercial search returned the association's own site and HOA directory listings, and no resident review, complaint or endorsement in any readable, citable form.
If owner sentiment matters to your decision — and in an HOA it usually does — the honest route is a board meeting or a call to the manager, not a page like this one.
What does exist, and is better than a review: this association publishes two years of meeting minutes and quarterly newsletters, including its 2026 annual member meeting. Those are the association's own record of what owners actually raise, and they are open to anyone.
- The June 2026 annual meeting records members discussing a very low ballot return rate, loose dogs in the community with a proposal to allow regulated dog runs, and missing ballots and incomplete owner records.
- It records the board confirming that each lot carries one vote, including vacant lots.
- It records the constitutional amendment requiring mailed ballots, with electronic voting limited unless the governing documents change.
- It records the president asking that rules be enforced “fairly and equitably, while also being handled with grace.”
Read those rather than trusting a summary — including this one.
Where it is, and how we derived it
No geocoder was used. A geocoder is provably wrong in this corridor: it returns a bed-and-breakfast near Flagstaff for “Starlight Pines”, a place near Valle for “Pine Canyon”, and “Blue Ridge Tank” for “Blue Ridge”. The coordinates below come from the county’s own plat polygons.
- Center: 34.63480, −111.11881
- Extent: longitude −111.130183 to −111.107430, latitude 34.616903 to 34.652656
- Distance to State Route 87: 0.35 miles, south-east of SR-87
- Method: County_Subdivisions/FeatureServer/0, where=Name LIKE 'STARLIGHT PINES%' AND Name NOT LIKE '%RANCHETTE%', de-duplicated by OBJECTID, outSR=4326; the envelope is taken over the plats that actually contain parcels. The result sits 1.5 km from the corridor anchor, inside the 11.3 km sanity limit.
- Streets the county records inside the plats: Apache, Hopi, Navajo, Lariat, Roundup and Stallion.
These figures stay out of the machine-readable markup on purpose. Five of the six extents are vertex envelopes rather than the layer’s own extent, and an envelope midpoint is not a surveyed point. Printed here, they can be reproduced with the query above; in structured data they would read as a precise location we do not have.
What we could not verify
The gaps are listed rather than filled, because a blank is information and a guess is not.
- Whether the $350 is flat or ad valorem in practice. The 2026–27 budget says $350 per member; the covenant says ad valorem up to $2.50 per $100. Ask the manager which basis applies to a specific lot.
- Sections 6.1, 6.3, 3.26, 3.27 and the 750 sq ft minimum verbatim in this run: the scanned covenant was still being OCR'd on 8 November 2026, so those are carried from the team's 6 November 2026 read of the same document.
- Whether Coconino County has accepted the roads. This is the question that decides whether section 3.27 costs a buyer money — ask Public Works in writing.
- Road surface, paved or gravel.
- Rental and short-term-rental status. No document read addresses letting the house.
Common questions
- What are the current dues at Starlight Pines?
- $350 per member for the fiscal year 1 June 2026 to 31 May 2027, approved by the board on 14 March 2026. The budget bills 612 assessments totaling $214,200, which reconciles at $350 each against 638 parcels.
- What is the smallest house I can build in Starlight Pines?
- A ground floor of 750 sq ft. That is the lowest minimum of the six associations here and the place where a small cabin is most likely to be permitted.
- How is Starlight Pines different from Starlight Pines Ranchettes?
- They are separate associations with separate covenants. Starlight Pines has 638 parcels and a $350 levy for 2026-27; the Ranchettes have 87 parcels, permit horses, and publish no fee figure at all. They share a name, a turn off State Route 87 and a water district, and nothing else.
- Who maintains the roads in Starlight Pines?
- It depends on the county. Amendment section 3.27 provides that if Coconino County does not accept the dedicated roads, the homeowners maintain the road system. Ask Public Works in writing whether these roads have been accepted; if they have not, paving and plowing are a private obligation shared among owners.
- Is Starlight Pines on a community sewer?
- No. Wastewater is individual septic. Water, by contrast, is the Blue Ridge district, and 629 of 638 parcels also sit inside the district's assessment boundary.
Where to go next
Buying or selling in Starlight Pines? The recorded covenants for a specific lot can be pulled and read before you make an offer. Call Jackie at (602) 818-0929.
Realty ONE Group Mountain Desert